<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:dc="http://purl.org/dc/elements/1.1/" version="2.0"><channel><atom:link rel="hub" href="http://tumblr.superfeedr.com/" xmlns:atom="http://www.w3.org/2005/Atom"/><description>103 Atlantic Avenue, Brooklyn, NY 11201   |   T 917-444-0572   |   nc2architecture.com</description><title>nC2 architecture llc | BLOG</title><generator>Tumblr (3.0; @nc2)</generator><link>http://nc2.tumblr.com/</link><item><title>Fort Greene Townhouse Landmarks Hearing</title><description>&lt;p&gt;First post for this project although we&amp;#8217;ve been working on it for a year already.  &lt;/p&gt;
&lt;p&gt;We&amp;#8217;re designing a very cool project in Fort Greene - the conversion of a dilapidated SRO (Single Room Occupancy multiple dwelling) to a two-family home.  The building dates back to the 1850s and is one of the oldest houses in the neighborhood.  The house is a wood-framed building with a full-height, full-width brick extension which was added, we think, in the 1910s or earlier.&lt;/p&gt;
&lt;p&gt;The new design of the building is somewhat unique and you can read about it on our website:  &lt;a href="http://nc2architecture.com/nC2_architecture/nC2_architecture___Fort_Greene_Townhouse_2.html#0" target="_blank"&gt;Fort Greene Townhouse&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;We presented the project to the New York City Landmarks Commission at a public hearing a couple of weeks ago specifically to request approval for a number of big-ticket items including modifications to the roofline and rear parapet, HVAC equipment on the roof, use of cementitious clapboards and aluminum-clad wood windows on the primary facade and the removal of the sad-looking two-story bay on the rear of the house.  All of these items are visible from a public way.&lt;/p&gt;
&lt;p&gt;The hearing went outstandingly well and the Commissioners not only complimented our work, but also indicated that they would approve most of the items we presented.  They requested some changes to the rear of the building where the bay is to be removed.  Also the cementitious clapboards (which satisfies a requirement from the Department of Buildings that the cladding material be non-combustible) were an issue for some of them, these Commissioners would have preferred to see wood clapboards (which DOB would not accept).  LPC will be negotiating this behind the scenes with DOB.  The group was split with regard to the rooftop HVAC units.  We are looking forward to going back for a follow-up meeting in the coming weeks.&lt;/p&gt;
&lt;p&gt;&lt;img alt="image" src="http://media.tumblr.com/f2a63c6e74a4a77cb014efe89159d97c/tumblr_inline_mh8surjOTS1qz4rgp.jpg"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/41530840241</link><guid>http://nc2.tumblr.com/post/41530840241</guid><pubDate>Sat, 26 Jan 2013 12:06:00 -0500</pubDate><category>townhouse</category><category>renovation</category><category>fort greene townhouse</category><category>Architecture</category></item><item><title>nC2 architecture has Launched a New Website!</title><description>&lt;p&gt;Many months in the making.  Bigger pictures, more projects, clearer format - check it out:&lt;/p&gt;
&lt;p&gt;&lt;a href="http://nc2architecture.com" target="_blank"&gt;nC2architecture.com&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;&lt;img alt="image" src="http://media.tumblr.com/9e9b359469f6de3118deb8be2ece439f/tumblr_inline_mh7qpcpKQZ1qz4rgp.png"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/41492386847</link><guid>http://nc2.tumblr.com/post/41492386847</guid><pubDate>Fri, 25 Jan 2013 22:17:00 -0500</pubDate><category>Architecture</category></item><item><title>Park Slope Triplex is Complete</title><description>&lt;p&gt;Wow, 7 months since the last post.  We&amp;#8217;ve been busy.  The Park Slope Triplex was completed a few months ago.  We&amp;#8217;ve had it photographed and the project now features prominently on our newly designed website.&lt;/p&gt;
&lt;p&gt;&lt;img alt="image" src="http://media.tumblr.com/96408aa7be1fbc979a8269394a372d23/tumblr_inline_mh7pviAF6X1qz4rgp.png"/&gt;&lt;/p&gt;
&lt;p&gt;Check it out: &lt;a href="http://nc2architecture.com/nC2_architecture/nC2_architecture___Park_Slope_Brownstone_Triplex.html#0" title="Park Slope Brownstone Triplex" target="_blank"&gt;Park Slope Brownstone Triplex&lt;/a&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/41491423097</link><guid>http://nc2.tumblr.com/post/41491423097</guid><pubDate>Fri, 25 Jan 2013 22:05:00 -0500</pubDate><category>park slope triplex</category><category>Architecture</category><category>Renovation</category><category>brownstone</category></item><item><title>Park Slope Triplex Millwork Progress</title><description>&lt;p&gt;The central stair, library and office space - almost complete and looking amazing!&lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_m55fol9I801r64qo9.png"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/24472054148</link><guid>http://nc2.tumblr.com/post/24472054148</guid><pubDate>Tue, 05 Jun 2012 10:49:00 -0400</pubDate><category>park slope triplex</category><category>Architecture</category><category>Renovation</category></item><item><title>Construction Progress on our Park Slope Triplex</title><description>&lt;p&gt;Work is moving along well on our Park Slope Triplex. The grand double-height entry, library and office space featuring the dramatic main stair is now completely open. This central space, which was always quite dark due to the depth of the building (typical townhouse with no side windows), is now flooded with light from both levels - a successful resolution of one of this project&amp;#8217;s main design challenges.&lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_m3rdm4g1VX1r64qo9.png"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/22716383466</link><guid>http://nc2.tumblr.com/post/22716383466</guid><pubDate>Wed, 09 May 2012 10:41:29 -0400</pubDate><category>park slope triplex</category><category>Renovation</category><category>Architecture</category></item><item><title>Gowanus Townhouse Progress</title><description>&lt;p&gt;More construction progress on the Gowanus Townhouse. The cantilevered steel structure for the deck is in.  The cantilever accommodates the client&amp;#8217;s request to have no supporting columns in the rear yard. Our structural engineering firm, &lt;a href="http://www.ynedpc.com/ja.html" target="_blank"&gt;Yoshinori Nito Engineering and Design PC&lt;/a&gt;, helped us out with this unique structural solution, which uses a tension member to transfer the upward load from the cantilever backspan to the townhouse&amp;#8217;s central beam in the cellar. &lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_m3rdccfnwA1r64qo9.png"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/22715075173</link><guid>http://nc2.tumblr.com/post/22715075173</guid><pubDate>Wed, 09 May 2012 09:57:00 -0400</pubDate><category>gowanus townhouse</category><category>Architecture</category><category>Renovation</category></item><item><title>nC2 architecture appears on MSN.com!</title><description>&lt;p&gt;M Lofts in the press again!  This time in MSN.com&amp;#8217;s real estate section:&lt;/p&gt;
&lt;p&gt;&lt;em&gt;&lt;strong&gt;&lt;a href="http://www.nc2architecture.com/nC2_architecture/nC2_architecture___press___MSN.com.html" target="_blank"&gt;MSN article on nC2 website&lt;/a&gt;&lt;/strong&gt;&lt;/em&gt; or &lt;em&gt;&lt;strong&gt;&lt;a href="http://realestate.msn.com/now-thats-a-staircase-11-eye-popping-designs#6" target="_blank"&gt;original&lt;/a&gt;&lt;/strong&gt;&lt;/em&gt;&lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_lz72u3T7mG1r64qo9.png"/&gt;&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;&lt;em&gt;&lt;a href="http://www.nc2architecture.com/nC2_architecture/nC2_architecture___M_Loft_Beds.html#0" title="M Lofts" target="_blank"&gt;Click here to read more about the M Lofts project on our website&amp;#8230;&lt;/a&gt;&lt;/em&gt;&lt;/strong&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/22130298552</link><guid>http://nc2.tumblr.com/post/22130298552</guid><pubDate>Mon, 30 Apr 2012 13:26:00 -0400</pubDate></item><item><title>More nC2 Press</title><description>&lt;p&gt;We&amp;#8217;re very excited about press coverage we&amp;#8217;ve received lately. nC2 architecture Principal and Founder, Richard Goodstein, has been featured in three articles since the beginning of the year.&lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_m33d5hsw9I1r64qo9.png"/&gt;&lt;/p&gt;
&lt;p&gt;Take a look:&lt;/p&gt;
&lt;p&gt;Haute Living wrote about the relationship of Richard&amp;#8217;s earlier work designing skyscrapers and other enormous commercial projects to his current work with nC2 architecture.&lt;/p&gt;
&lt;p&gt;&lt;em&gt;&lt;strong&gt;&lt;a href="http://www.nc2architecture.com/nC2_architecture/nC2_architecture___press___Haute_Living.html" title="Haute Living" target="_blank"&gt;Haute Living article on nC2 website&lt;/a&gt;&lt;/strong&gt;&lt;/em&gt; or &lt;em&gt;&lt;strong&gt;&lt;a href="http://www.hauteliving.com/2012/02/haute-design-spotlight-on-architect-richard-alan-goodstein/" target="_blank"&gt;[original]&lt;/a&gt; &lt;/strong&gt;&lt;/em&gt;&lt;/p&gt;
&lt;p&gt;An article in Boulevard Magazine where Richard discusses the renovation and modernization of an historic brownstone:&lt;/p&gt;
&lt;p&gt;&lt;em&gt;&lt;strong&gt;&lt;a href="http://www.nc2architecture.com/nC2_architecture/nC2_architecture___press___The_Boulevard.html" title="Boulevard Article on nC2 website" target="_blank"&gt;Boulevard Magazine article on nC2 website&lt;/a&gt;&lt;/strong&gt;&lt;/em&gt; or &lt;em&gt;&lt;strong&gt;&lt;a href="http://www.boulevardli.com/index.php/articles/design/631-richard-goodstein.html" target="_blank"&gt;[original]&lt;/a&gt;&lt;/strong&gt;&lt;/em&gt;&lt;/p&gt;
&lt;p&gt;And a short biographical sketch in the Times Square Chronicles tracing Richard&amp;#8217;s career from Europe to corporate NYC and finally to his current work with nC2.&lt;/p&gt;
&lt;p&gt;&lt;em&gt;&lt;strong&gt;&lt;a href="http://www.nc2architecture.com/nC2_architecture/nC2_architecture___press___Times_Sq_Chronicles.html" target="_blank"&gt;Times Square Chronicles article on nC2 website&lt;/a&gt;&lt;/strong&gt;&lt;/em&gt; or &lt;em&gt;&lt;strong&gt;&lt;a href="http://t2conline.com/arch/" target="_blank"&gt;[original]&lt;/a&gt;&lt;/strong&gt;&lt;/em&gt;&lt;/p&gt;
&lt;p&gt;We&amp;#8217;ve also updated the &lt;em&gt;&lt;strong&gt;&lt;a href="http://www.nc2architecture.com/nC2_architecture/nC2_architecture___press.html" target="_blank"&gt;press page&lt;/a&gt;&lt;/strong&gt;&lt;/em&gt; on the nC2 website to show these and other articles featuring nC2 architecture.&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/21849190969</link><guid>http://nc2.tumblr.com/post/21849190969</guid><pubDate>Thu, 26 Apr 2012 10:49:00 -0400</pubDate></item><item><title>Park Slope Triplex - More Construction Progress</title><description>&lt;p&gt;Some shots of the upper floor. Drywall is up and the play between the exposed brick party walls and the interior bedroom partition walls is becoming visible. Note how effective the addition of full-height interior glass panels is going to be with regard to bringing natural light into the interior office/library/stair space at the center of the building.&lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_m1pc6jdq1A1r64qo9.png"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/20170223352</link><guid>http://nc2.tumblr.com/post/20170223352</guid><pubDate>Fri, 30 Mar 2012 10:28:53 -0400</pubDate><category>park slope triplex</category><category>progress</category></item><item><title>Gowanus Townhouse Demo</title><description>&lt;p&gt;After a long permitting process (described in an earlier post), demo has finally begun on our townhouse project in Gowanus. This project involves the combination of two units of a 3-family building and the installation of a cantilevered steel deck on the rear of the 2nd floor. The pictures below show ceiling demolition in preparation to install the new framing for the stair opening.&lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_m18p4aLY971r64qo9.png"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/19679755275</link><guid>http://nc2.tumblr.com/post/19679755275</guid><pubDate>Wed, 21 Mar 2012 10:33:00 -0400</pubDate><category>gowanus townhouse</category><category>progress</category></item><item><title>Brooklyn Heights Duplex Demo</title><description>&lt;p&gt;Demolition began last week on our Brooklyn Heights Duplex project on Montague Street. We are combining two apartments with a stair and double height dining space. The upper level had been an abandoned construction site for some time now before being purchased by our client, the owner of the unit below it. The images below are of the upper level, which will be converted to two bedrooms, a &amp;#8220;man cave&amp;#8221; and a dramatic gallery overlooking the dining space below. The lower level has not yet been demolished; that floor will be open-plan kitchen, dining and living spaces. &lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_m18nt3fhjP1r64qo9.png"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/19679465815</link><guid>http://nc2.tumblr.com/post/19679465815</guid><pubDate>Wed, 21 Mar 2012 10:21:00 -0400</pubDate><category>brooklyn heights duplex</category><category>progress</category></item><item><title>Newswalk Lobby at Night</title><description>&lt;p&gt;Now that it&amp;#8217;s almost finished, the Newswalk Lobby looks amazing at night:&lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_m0msnbbFVs1r64qo9.jpg"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/19010763013</link><guid>http://nc2.tumblr.com/post/19010763013</guid><pubDate>Fri, 09 Mar 2012 14:00:00 -0500</pubDate><category>newswalk</category><category>Renovation</category></item><item><title>Newswalk Condominium Lobby Renovation Almost Finished</title><description>&lt;p&gt;Some photos of the Newswalk Lobby taken at our site visit on this glorious sunny day. We can now begin to see how dramatic the transformation of the space is. Our use of a muted palette and a few select minimalist design elements greatly enhance the appearance of the existing, remaining components. This is especially noticeable with regard to the exposed structural steel, which was previously lost in the over-exuberance of the original design.&lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_lzuqf6NVZa1r64qo9.png"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/18130787393</link><guid>http://nc2.tumblr.com/post/18130787393</guid><pubDate>Thu, 23 Feb 2012 10:19:00 -0500</pubDate><category>newswalk</category><category>progress</category></item><item><title>Brooklyn Heights Apartment Combination Approved by DOB</title><description>&lt;p&gt;Fresh on the heels of our Gowanus Townhouse approval yesterday is a DOB approval for combining two apartments on Montague Street. This project turns a small two-bedroom apartment into a luxurious three-bedroom duplex with a dramatic double-height space. Construction should be starting within days.&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/17667724800</link><guid>http://nc2.tumblr.com/post/17667724800</guid><pubDate>Wed, 15 Feb 2012 14:57:00 -0500</pubDate><category>brooklyn heights duplex</category></item><item><title>Gowanus Townhouse Project Approved by DOB</title><description>&lt;p&gt;Finally.&lt;/p&gt;
&lt;p&gt;It&amp;#8217;s been a long haul to get this project approved. We are converting a three-story, three-family, townhouse to two-family, creating an owners duplex out of the lower two floors. We ran into what has been described by one official as a &amp;#8220;glitch&amp;#8221; in the code. The issue of contention: DOB was requiring a sprinkler system to be installed throughout the entire building, despite the fact that the scope of work is relatively limited. This official told us that there was never an intention that alterations of this scale, to a building of this size, trigger the requirement to install a full sprinkler system.&lt;/p&gt;
&lt;p&gt;We needed to obtain a reconsideration from the Deputy Borough Commissioner at DOB and, for that, needed to obtain a variance from the Fire Department. Due to multiple layers of bureaucracy, the delay was considerable; however, we were able to obtain both DOB reconsideration and FDNY variance and have the project approved without the sprinkler requirement.&lt;/p&gt;
&lt;p&gt;Despite the fact that the process was tedious, we like to regard this as a valuable learning experience. The new Building and Fire Codes are very stringent with regard to sprinklers and architects are going to need to get used to sprinklering smaller projects which never before required sprinklers. We recognize the safety advantage of fully sprinklered buildings, but for some of our projects, the cost associated with the installation of such as system is not proportional to the budget and project scope. Being able to balance cost/scope vs. additional fire safety, and get Buildings and Fire officials to agree with us, has been an invaluable skill we have obtained through getting this project approved.&lt;/p&gt;
&lt;p&gt;More details with regard to the sprinklering requirements in the new codes will follow sometime in the near future.&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/17656795607</link><guid>http://nc2.tumblr.com/post/17656795607</guid><pubDate>Wed, 15 Feb 2012 09:17:00 -0500</pubDate><category>gowanus townhouse</category><category>renovation</category><category>dob</category><category>townhouse</category></item><item><title>M Lofts Appear in Design Milk</title><description>&lt;p&gt;The popular design website Design Milk has featured our M Loft project in an article entitled &lt;em&gt;&lt;a href="http://design-milk.com/20-beautiful-modern-staircases/" target="_blank"&gt;20+ Beautiful Modern Staircases.&lt;/a&gt;&lt;/em&gt;  Here&amp;#8217;s the link:&lt;/p&gt;
&lt;p&gt;&lt;em&gt;&lt;a href="http://design-milk.com/20-beautiful-modern-staircases/" target="_blank"&gt;http://design-milk.com/20-beautiful-modern-staircases/&lt;/a&gt;&lt;/em&gt;&lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_lz72u3T7mG1r64qo9.png"/&gt;&lt;/p&gt;
&lt;p&gt;&lt;em&gt;&lt;a href="http://www.nc2architecture.com/nC2_architecture/nC2_architecture___M_Loft_Beds.html#0" title="M Lofts" target="_blank"&gt;Click here to read more about the M Lofts project on our website&amp;#8230;&lt;/a&gt;&lt;/em&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/17383672001</link><guid>http://nc2.tumblr.com/post/17383672001</guid><pubDate>Fri, 10 Feb 2012 15:26:00 -0500</pubDate><category>m lofts</category><category>loft bed</category><category>Millwork</category></item><item><title>Newswalk Condominium Lobby Renovation Unveiled</title><description>&lt;p&gt;The pedestrian &amp;#8220;tunnel&amp;#8221; at the Newswalk Lobby has now been removed, making it possible for progress on the project to be viewed by all. The full effect is not yet visible because the desk, elevator shaft and other finishes are still covered with protective material. The space looks amazing though, even in its almost-finished state.&lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_lyz62la3WB1r64qo9.png"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/17153180744</link><guid>http://nc2.tumblr.com/post/17153180744</guid><pubDate>Mon, 06 Feb 2012 09:16:00 -0500</pubDate><category>newswalk</category><category>architecture</category><category>design</category><category>interiors</category></item><item><title>Park Slope Triplex - Construction Progress</title><description>&lt;p&gt;Structural steel on the lower level and at the new picture window opening to the backyard.  New stair stringer too! &lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_lys8wwJbtk1r64qo9.png"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/16931354472</link><guid>http://nc2.tumblr.com/post/16931354472</guid><pubDate>Thu, 02 Feb 2012 14:58:00 -0500</pubDate><category>architecture</category><category>design</category><category>interiors</category><category>park slope triplex</category><category>renovation</category><category>brownstone</category><category>townhouse</category></item><item><title>Park Slope Triplex - Construction Progress</title><description>&lt;p&gt;Brick. Some to remain exposed, some to be covered.&lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_lys5bkyg1Q1r64qo9.png"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/16929514268</link><guid>http://nc2.tumblr.com/post/16929514268</guid><pubDate>Thu, 02 Feb 2012 14:24:00 -0500</pubDate><category>park slope triplex</category><category>architecture</category><category>design</category><category>brownstone</category><category>interiors</category><category>townhouse</category></item><item><title>Newswalk Condominium Lobby Renovation - Construction Progress</title><description>&lt;p&gt;Our lobby renovation at 535 Dean Street - the Newswalk Condominium Building - is quickly approaching completion.  Here are some shots of the millwork, front desk and slotted vestibule ceiling. &lt;/p&gt;
&lt;p&gt;&lt;img src="http://media.tumblr.com/tumblr_lys510i6LY1r64qo9.png"/&gt;&lt;/p&gt;</description><link>http://nc2.tumblr.com/post/16929341539</link><guid>http://nc2.tumblr.com/post/16929341539</guid><pubDate>Thu, 02 Feb 2012 14:08:00 -0500</pubDate><category>newswalk</category><category>architecture</category><category>design</category><category>interiors</category></item></channel></rss>
